Sterile Processing Training & Compliance

CHARISMA SPD • STERILE PROCESSING WORKFORCE READINESS

Sterile Processing Training & Compliance

A structured pre-placement pathway for sterile processing and endoscope reprocessing personnel, combining foundational safety training, role-specific learning, competency validation, and facility-specific orientation.

What must be completed before independent work

Training is assigned according to the employee’s role, job scope, equipment exposure, chemicals handled, device types, and the receiving facility’s requirements. Completion of online learning supports readiness but does not replace hands-on competency validation where technical skills must be demonstrated.

1. Core Safety

Infection prevention, bloodborne pathogens, PPE, hand hygiene, chemical safety, confidentiality, emergency procedures, and workplace injury reporting.

2. Technical Learning

Role-specific modules covering decontamination, inspection, assembly, packaging, sterilization, monitoring, traceability, storage, and IFU-driven processing.

3. Competency Validation

Applicable skills are verified through documentation, direct observation, return demonstration, or another facility-approved competency method before independent work.

STERILE PROCESSING TECHNICIAN PATHWAY

Core technical modules

These modules support the essential workflow from point-of-use treatment through storage, distribution, and traceability.

WORKFLOW 01

Point-of-Use Treatment & Safe Transport

Handling and transport practices that support safe transfer of contaminated devices to decontamination.

WORKFLOW 02

Decontamination Workflow & Cleaning

Core decontamination sequence, cleaning principles, workflow control, and safe handling practices.

WORKFLOW 03

Inspection, Testing, Assembly & Set Verification

Inspection, functionality checks, assembly accuracy, and tray/set verification before packaging.

WORKFLOW 04

Packaging, Labeling & Sterile Barrier Systems

Packaging selection, labeling, and protection of devices using appropriate sterile barrier systems.

WORKFLOW 05

Sterilization Cycle Selection & Load Preparation

Cycle selection, load preparation, and process considerations based on device and manufacturer instructions.

WORKFLOW 06

Biological, Chemical & Mechanical Monitoring

Monitoring concepts used to support process control and sterilization quality assurance.

WORKFLOW 07

Load Release, Recall & Documentation

Documentation, release practices, recall response, and escalation when a process concern is identified.

WORKFLOW 08

Storage, Distribution & Event-Related Sterility

Handling, storage, distribution, package integrity, and event-related sterility considerations.

WORKFLOW 09

Instrument Tracking & Traceability

Traceability principles connecting instruments, sets, cycles, processing steps, and distribution.

WORKFLOW 10

Manufacturer IFUs & Device-Specific Processing

Using current manufacturer instructions to guide safe, device-specific processing decisions.

ENDOSCOPE REPROCESSING PATHWAY

Additional endoscope competencies

Personnel assigned to flexible endoscope reprocessing should complete the applicable additional modules below and receive device- and equipment-specific competency validation.

ENDOSCOPE 01

Pre-Cleaning, Leak Testing & Manual Cleaning

Foundational workflow for pre-cleaning, leak testing, manual cleaning, rinsing, and preparation for HLD.

ENDOSCOPE 02

AER Setup, HLD & Cycle Verification

Automated endoscope reprocessor setup, HLD cycle execution, verification, and documentation.

ENDOSCOPE 03

HLD Chemistry & MEC Monitoring

Safe handling and monitoring of HLD chemistry, including minimum effective concentration requirements.

ENDOSCOPE 04

Drying, Storage & Transport

Drying practices, storage expectations, and safe transport of reprocessed endoscopes.

ENDOSCOPE 05

Endoscope & Procedure Traceability

Traceability requirements linking scopes, processing cycles, procedures, and documentation.

ENDOSCOPE 06

Chemical Exposure Controls, PPE & Spill Response

Protective practices for employees handling disinfectants and other hazardous reprocessing chemicals.

BEFORE INDEPENDENT ASSIGNMENT

Competency validation matters

Online completion alone should not be treated as proof of technical competency. Applicable technical skills should be validated through direct observation, return demonstration, documented prior competency, or another approved assessment process before an employee works independently.

  • Equipment- and device-specific skills
  • Facility sterilizer and washer use
  • Low-temperature sterilization where applicable
  • HLD chemistry and AER processes
  • Specialty devices and loaner instrumentation
  • Local documentation, quality, and escalation workflows

Clearance workflow

1. Role identified
2. Credentials and experience reviewed
3. Core safety training completed
4. Technical competencies verified
5. Facility orientation completed
6. Ready for placement after applicable items are cleared

Core pre-start safety topics

  • Infection Prevention & Standard Precautions
  • Bloodborne Pathogens & Exposure Control
  • PPE, Sharps Safety & Exposure Reporting
  • Hand Hygiene
  • Hazard Communication / Safety Data Sheets
  • HIPAA, Confidentiality & Professional Conduct
  • Emergency / Fire Safety & Workplace Injury Reporting

Assignment-specific and facility-specific requirements may add to these topics. Employees should follow current manufacturer IFUs, employer policies, and the receiving facility’s approved procedures.

Regulatory & practice references

Facility policy, current manufacturer instructions for use, accreditation requirements, and applicable professional standards may establish additional requirements beyond this training framework.